Bathroom Waterproofing
The membrane under everything else, done to the standard, checked before tiling and certified in writing.
- Applied to the Australian Standard for wet areas
- Full cure before a single tile goes down
- Junctions, penetrations and hobs detailed properly
- Certificate issued and handed to you at completion
Waterproofing is the only part of a bathroom that is completely invisible once the job is finished and the only part whose failure takes the wall frame, the floor structure and the room next door with it. It is also, for exactly that reason, the easiest place in a renovation to save a few hundred dollars without the customer ever knowing.
What the standard actually asks for
Waterproofing of domestic wet areas is governed by an Australian Standard, and it is more specific than most people expect. It sets out which surfaces have to be covered and to what height, how junctions between surfaces are treated, how penetrations are sealed, and what the substrate has to be before anything is applied.
The parts that matter in practice are the junctions, not the flat areas. A membrane rolled across an open floor is the easy bit. Where bathrooms fail is at the wall-to-floor junction, at internal corners, around the waste, where the tap bodies and the shower rail penetrate the wall, and at the edge of a hob or a step-down. Those points move slightly as a building moves, which is why they are bonded with flexible detail rather than simply painted over.
The other requirement people underestimate is the substrate. A membrane bonds to what it is put on. Applied over a dusty screed, an unprimed sheet, or a surface that is still holding moisture, it will do exactly what it is asked to do and then let go.
Falls, and the reason they come first
A membrane is a barrier, not a drain. Any water that reaches it has to be led somewhere, so the floor underneath has to fall to the waste before waterproofing begins.
This is the sequence step that gets compressed when a job is running late, and it cannot be fixed afterwards. If the screed does not fall correctly, water sits on the membrane under the tiles indefinitely. The bathroom will look perfect and will slowly saturate the tile bed, and the first symptom is usually staining in the grout that no cleaning will lift.
Cure time is not padding
Once the membrane is on it has to cure to its full film thickness before anything covers it. Depending on the product and the conditions that is a real wait, and in the humidity here it can be longer than the tin suggests, because the coating gives up its moisture more slowly when the air is already carrying so much.
Tiling onto a membrane that has not fully cured is completely invisible at handover. It is one of the most common reasons a bathroom that was renovated properly in every visible respect starts leaking in its second or third year.
We build the cure into the program rather than treating it as slack, and the wet area is inspected before tiling starts.
The certificate
At completion you get a certificate recording what was applied, where, and by whom. Keep it. It is what you hand a purchaser, an insurer or a body corporate when the question comes up, and on a unit it is often the document that decides whether a claim is entertained at all.
For waterproofing as part of a larger job it is included in the scope rather than quoted separately. If you are chasing an existing failure instead, start at leaking shower repairs, or call 0468 047 067 and describe what the room is doing.
Suburbs we cover for this work
- Edge Hill Older highset timber homes, small original wet areas, and plumbing you can actually get to from underneath.
- Edmonton The southern corridor, where a good share of the work is investment stock and the scope has to hold to a number.
- Manunda Post-war homes with a tiny bathroom and a separate toilet, where taking one wall out changes everything.
- Smithfield Brick and tile family homes where the main bathroom and the ensuite reach the end of their life together.
- Palm Cove Apartments and holiday lets, renovated inside a booking window and to the building's hours rather than ours.
- Redlynch Estate homes now old enough that the original wet areas, and the fans that were meant to dry them, are both due.
- Whitfield Hillside blocks and split levels, where access and where the waste can run decide what the room can be.
- Trinity Beach Duplexes and low-rise blocks where the approvals matter, and houses close enough to the water that the hardware pays for it.
Questions about bathroom waterproofing
Do I get a waterproofing certificate at the end?
Yes, and it is worth keeping with the house papers. It records what was applied, where and by whom. It is the document a purchaser's inspector, an insurer or a body corporate will ask for, and in a unit it can decide whether a claim is entertained at all.
Get it measured and quoted
Give us the room, roughly what is in it now and what you want changed. We will come and measure it before anyone talks about a price.
- On site
- Monday to Friday, 7am to 4pm
- Covering
- Cairns, the northern beaches to Palm Cove, south to Edmonton
- Quotes
- Measured in the room, given in writing, no obligation
- We look at the room before anyone talks about money, because a bathroom cannot be priced from a photograph
- The quote is itemised: what comes out, what goes back, and which fixtures sit at which tier
- You are left holding a written scope you can put beside somebody else's and actually compare